Henan Lanphan Industry Co., Ltd.
  • English
  • Español
  • لغة العربية
  • enquiry@lanphan.com
  • +86-371-67447999
  • Home
  • About Us
  • Products
  • News
  • Service
  • Certificates
  • Inquiry
  • Contact Us
Products
  • Rubber Expansion Joint
  • Stainless Steel Bellows
  • PTFE Lined Expansion Joint
  • Metal Expansion Joint
  • Metal Flexible Hoses
  • Dismantling Joint
  • Flange Adaptor
  • Flexible Coupling
  • Rubber Lined Pipe
  • Non-metallic Expansion Joint
  • Rubber Check Valve
  • Flange
About Us
  • Company Profile
  • Equipments
  • Video
  • FAQ
Contact Us
Live Chat
  • Amy
  • Ryan

Tel:+86-371-67447999

Fax:+86-371-67447888

E-mail:enquiry@lanphan.com

Add:NO.68 Mengjin Road, Shangjie District, Zhengzhou City, Henan Province, China

Need help?
E-mail Us:
enquiry@lanphan.com
Follow Us
  • Facebook
  • YouTube
  • Twitter
  • Google+
  • Linkedin
Products
  • Rubber Expansion Joint
  • Stainless Steel Bellows
  • PTFE Lined Expansion Joint
  • Metal Expansion Joint
  • Metal Flexible Hoses
  • Dismantling Joint
  • Flange Adaptor
  • Flexible Coupling
  • Rubber Lined Pipe
  • Non-metallic Expansion Joint
  • Rubber Check Valve
  • Flange
Home >News > Metallic E
Metallic Expansion Joint Installation and Maintenance Guide
Author: liweiTime: 2015-08-03 11:32:49

mtallic expansion joint

  • Inspect for damage during shipment, i.e., dents, broken hardware, water marks on carton, etc.
  • Store in clean dry area where it will not be exposed to heavy traffic or damaging environment.
  • Use only designated lifting lugs.
  • Make the piping systems fit the expansion joint. By stretching, compressing, or offsetting the joint to fit the piping, the joint may be over stressed when the system is in service.
  • It is good practice to leave one flange loose until the expansion joint has been fitted into position. Make necessary adjustment of loose flange before welding.
  • Install joint with arrow pointing in the direction of flow.
  • Install single Van stone liners, pointing in the direction of flow. Be sure to install a gasket between the mating flange and liner.
  • With telescoping Van stone liners, install the smallest I.D. liner pointing in the direction of flow.
  • Remove all shipping devices after the installation is complete and before any pressure test of the fully installed system.
  • Remove any foreign material that may have become lodged between the convolutions.
  • Refer to EJMA Standards for proper guide spacing and anchor recommendations.
  • Do not drop or strike carton.
  • Do not remove shipping bars until installation is complete.
  • Do not remove any moisture-absorbing desiccant bags or protective coatings until ready for installation.
  • Do not use hanger lugs as lifting lugs without approval of manufacturer.
  • Do not use chains or any lifting device directly on the bellows or bellows cover.
  • Do not allow weld splatter to hit unprotected bellows. Protect with wet chloride-free insulation.
  • Do not use cleaning agents that contain chlorides.
  • Do not use steel wool or wire brushes on bellows.
  • Do not force-rotate one end of an expansion joint for alignment of boltholes. Ordinary bellows are not capable of absorbing torque.
  • Do not hydrostatic pressure test or evacuate the system before installation of all guides and anchors.Pipe hangers are not adequate guides.
  • Do not exceed a pressure test 1-½ times the rated working pressure of the expansion joint.
  • Do not use shipping bars to retain thrust if tested prior to installation.
  • Pipe hangers are not adequate guides.

 

Previous Page:The features of double flange dismantling joint from China supplier
Next Page:The description of Rubber lining steel pipeline
  • Home
  • About Us
  • Products
  • News
  • Service
  • Certificates
  • Inquiry
  • Contact Us
Tel:+86-371-67447999Fax:+86-371-67447888E-mail:enquiry@lanphan.com
Address:NO.68 Mengjin Road, Shangjie District, Zhengzhou City, Henan Province, China
Copyright @ 2014 Henan Lanphan Industry Co., Ltd. All Rights Reserved.
  • phone